Drydock rehabilitation at
Davie Industries
Levis, Quebec, Canada
Over 70,000 Ambex Anchoring Capsules -AACT used for rebar and formwork anchors.
ALCAN Hydro-electric
Alma, Quebec, Canada
Over 50,000 Ambex Anchoring Capsules -AACT used to anchor rebar.
Widening île-aux-Tourtes Bridge
Highway 40
Montreal, Quebec, Canada
Over 15,000 Ambex Anchoring Capsules -AACT installed at 12 in. c/c (300 mm c/c).
Farmer Hydro-electric station
Gatineau, Quebec, Canada
70,000 Ambex Anchoring Capsules -AACT used to anchor rebar in cold conditions.
Reconstruction of Autoroute 25
Montreal, Quebec, Canada
Over 100,000 Ambex Anchoring Capsules -AACT installed in 1997.
Reconstruction of Lafayette
Blvd Overpass
Longueuil, Quebec, Canada
Ambex Anchoring Capsules -AACT used to anchor new rebar in existing concrete.
Widening Highway 407
Toronto, Ontario, Canada
2006-2007
Over 150,000 Ambex Anchoring Capsules -AACT3/4¨ installed to anchor rebar in existing structure.
Widening Bridge Over Route 335
Laval, Quebec, Canada
Ambex Anchoring Capsules -AACT used to anchor new rebar in existing structure.
Quai Alexandra
Port of Montreal
Montreal, Quebec, Canada
Over 20,000 Ambex Anchoring Capsules -AACT installed to anchor rebar and form work for wharf rehabilitation.
Beauharnois
Beauharnois Center, Quebec, Canada
Ambex Anchoring Capsules-AAC were installed for the repair of the water in-take structure for Hydro-Quebec.
Ambex Anchoring Capsules - ARC
Quebec, Canada
Ambex Anchoring Capsules -ARC were used to install bolt as part of widening walls of a overpass on RT 104 by Construction Robert Brodeur.